Winter Projects
December 26th, 2008 by Jim Baldwin | No Comments | Filed in Renovation LogMove the boat into a warehouse. It is a great spot, heated, with a mezzanine. the mezzanine allows me to walk right off the floor onto the transom of the boat.
There is a lot to do this winter:
- Re seat ALL the deck hardware
- Replace all the teak w/ Star Board
- Repair hatch
- Build instrument bridge on hatch
- Redo the topside, new awl grip and paint
- Blast the bottom and re fair it
- Re seat the keel



